Performance Analysis of Electrosteel Steels Ltd. Pre, During and Post CIRP: A Case Study
DOI:
https://doi.org/10.33516/maj.v55i2.91-95pKeywords:
No Keywords.Abstract
The Corporate Insolvency Resolution Process (CIRP) of ESL was commenced on 21st July, 2017 and the resolution was approved on 17th april, 2018. India’s dedicated bankruptcy resolution programme, which seeks to untangle billions of dollars stuck in bad loans, recorded its second-biggest successful recovery to date after global resources major Vedanta acquired management control of Electrosteel Steels Ltd (ESL) and named a new board to run the distressed steelmaker. This paper provides the analysis of operational and financial performance of the company pre, during and post Corporate Insolvency Resolution process.Downloads
Download data is not yet available.
Downloads
Published
2020-02-29
How to Cite
Gupta, S. K. (2020). Performance Analysis of Electrosteel Steels Ltd. Pre, During and Post CIRP: A Case Study. The Management Accountant Journal, 55(2), 91–95. https://doi.org/10.33516/maj.v55i2.91-95p
Issue
Section
Case Study