E-way Bill : Obligation of Generating and Position of an EPC Contractor Under Various Circumstances
DOI:
https://doi.org/10.33516/maj.v53i9.49-58pAbstract
No Abstract.Downloads
Download data is not yet available.
Downloads
Published
2018-09-01
How to Cite
Paul, S., & Nath, P. (2018). E-way Bill : Obligation of Generating and Position of an EPC Contractor Under Various Circumstances. The Management Accountant Journal, 53(9), 49–58. https://doi.org/10.33516/maj.v53i9.49-58p
Issue
Section
Taxation